3STAC Connector
Machine & enterprise data integrationHardware and software at once: connects PLCs, sensors and smart gauges — and enterprise systems such as ERP, PPS, CAQ, Excel and CMM repositories — through the same interface. No PLC reprogramming. Line retrofit in weeks instead of the 6–18 months of an MES/SAP project.
- Pain points solved
- Machine data nobody stores
- MES/SAP integrations that take 6–18 months





